• Experience

    • Experience

    • Experience

Cement Material Cooler

Location: San Antonio, TX

Client: Capitol Aggregates

JSR’s Industrial Division removed the existing cement material cooler and replaced it with a new cooler. New concrete footings and piers were constructed to support the cooler. To meet the client’s time restrictions, the cooler was assembled on-site on temporary footing and hoisted to it final location. The removal of the existing and installation of the new cooler was performed during off hours to not disrupt normal production times.

Recent News

JSR, Inc. was awarded in Sept 2021 3rd Calvary Regiment (3CR) Wash Rack Repairs in Fort Hood, Texas.

-

Recent News

JSR was recently awarded in Feb 2022  a Design Build task order for Repair Roof and HVAC System B2530 JBSA, FSH.

-